Thalle tullygroup - small

McAlpine Creek Relief Sewer- Phase 4

PLEASE REPLY WITH YOUR INTENT TO QUOTE

Deadline of proposals; responses due ASAP by Sept 19th noon to Thalle Construction Inc.

Offers are encouraged to be sent to Thalle 24 hours in advance of Clint bid Date Sept 20th 2:00 on company letterhead, noting related pricing per client bid items, scope inclusion exclusions, business utilization participation, offers received after deadline may be deemed non-responsive.

Send your offer via email to  This e-mail address is being protected from spambots. You need JavaScript enabled to view it ; fax 919-241-1659 Thalle Contact(s): Vincent Zannini 919.241.1635  This e-mail address is being protected from spambots. You need JavaScript enabled to view it : Craig Miller 919.241.1627   This e-mail address is being protected from spambots. You need JavaScript enabled to view it

BID DOCUMENTS CAN BE DOWNLOADED AT HTTPS://THALLE.SHAREFILE.COM/D-S2F482F57C5C41ACA

Plans can also be obtained/viewed by appointment at Charlotte Water Office, McKim & Creed Office, Hispanic Contractors Assoc. of the Carolinas (HCAC),  Metrolina Minority  Contractors Assoc. (MMCA)and at Thalle’s office in Hillsborough NC

Project Description: Approximately 6,047 lineal feet of 36” and 10,504 lineal feet of 30” sanitary sewer outfall; 59 manholes; connections to existing sewer lines and structures; erosion and sediment control, site cleanup, fertilizing, seeding, and mulching; and testing and miscellaneous work. All subcontracts and purchase orders will be in compliance with contract documents not limited to: labor and wage requirements, health & safety, equal employment opportunity, Domestic steel and insurance limits, contact time other clauses

Divisions of work:, Survey, field-office, Clearing & grubbing, demo, dewatering and drainage, erosion-control, Rock-drilling & blasting, shoring trench support, seeding: bank stabilization, wetland reforestation, Jack and bore, geotechnical instrumentation, Sewer-Concrete-coating, Pipe-TV-Inspection, fencing, geotextile pipe and fittings, , DIP, SCP, PVC . FRP, precast manholes & structures, FRPmanoles and structures, manhole vents-pipe, gravel-aggregates, dump-truck-hauling

Business utilization MBE SBE firms are encouraged to participate & will be listed at time of bid, Work & materials may be combined or divided to facilitate maximum participation. Subcontractors are obliged to sublet to 2nd & 3rd tier targeted businesses subcontractors. firms needing assistance with obtaining bonding, loan capital, lines of credit, insurance, quickpay & payment-agreements, obtaining equipment & supplies materials or negotiate joint venture & partnership arrangements can contact Thalle for assistance. Thalle will negotiate fairly with interested DBE firms & will not reject firms as unqualified without sound reasons based capabilities.

Job Opportunities

Renew your Membership

Please select your membership category, our staff will contact you to collect additional information.

HCAC Membership Levels

HCAC Mission

Our mission is to provide the necessary resources to ensure the continued progress of our members, while promoting the long term success of Hispanic-owned construction businesses in the Carolinas.

Login Form



/** Zoho Script **/